Hi all, We need an announcement that we expected to have everyone updated to pacman-5.0 soon so that we can switch many things to using hooks. There are at minimum three things I want to see using hooks in the near future: 1) info install 2) desktop cache updates 3) font cache updates ... Each of these will require a rebuild to remove the install script handling this. If users are not updated to pacman-5.0 before this rebuild, there will be no install script run and no hooks run. Thus I want to make the following announcement: --DRAFT-- Required update to pacman-5.0.1 before 2016-04-17 The release of pacman-5.0 bought support for transactional hooks. These will allow us to (e.g.) run font cache updates a single time during an update rather than after each font package. This will both speed up the update process, but also reduce packaging burden for the Developers and Trusted Users. In order for the use of hooks to be started, we require all users to have updated to at least pacman-5.0.1 before 2016-04-23. Pacman-5.0.1 was released on 2016-02-23, so this will have given everyone two months to update their system. --END DRAFT-- Comments? Allan
On 03/23/2016 11:30 AM, Allan McRae wrote:
The release of pacman-5.0 bought support for transactional hooks.
Spotted a typo: bought -> brought The rest looks good to me. -- Regards, Felix Yan
On Wed, 23 Mar 2016 13:30:45 +1000 Allan McRae <allan@archlinux.org> wrote:
Hi all,
- snip -
--DRAFT-- Required update to pacman-5.0.1 before 2016-04-17
The release of pacman-5.0 bought support for transactional hooks. These will allow us to (e.g.) run font cache updates a single time during an update rather than after each font package. This will both speed up the update process, but also reduce packaging burden for the Developers and Trusted Users.
In order for the use of hooks to be started, we require all users to have updated to at least pacman-5.0.1 before 2016-04-23. Pacman-5.0.1 was released on 2016-02-23, so this will have given everyone two months to update their system. --END DRAFT--
Comments?
Allan
Hi Allan, looks good except for the date. April 17 or 23? Probably the latter. Cheers, Thorsten
On 23/03, Thorsten Töpper wrote:
On Wed, 23 Mar 2016 13:30:45 +1000 Allan McRae <allan@archlinux.org> wrote:
Hi all,
- snip -
--DRAFT-- Required update to pacman-5.0.1 before 2016-04-17
The release of pacman-5.0 bought support for transactional hooks. These will allow us to (e.g.) run font cache updates a single time during an update rather than after each font package. This will both speed up the update process, but also reduce packaging burden for the Developers and Trusted Users.
In order for the use of hooks to be started, we require all users to have updated to at least pacman-5.0.1 before 2016-04-23. Pacman-5.0.1 was released on 2016-02-23, so this will have given everyone two months to update their system. --END DRAFT--
Comments?
Allan
Hi Allan,
looks good except for the date. April 17 or 23? Probably the latter.
He did say April the 23rd though? -- Sincerely, Johannes Löthberg PGP Key ID: 0x50FB9B273A9D0BB5 https://theos.kyriasis.com/~kyrias/